1

High-Efficiency 400 kW Chiller Installation Delivers Fifty Thousand Pounds Annual Cost Reduction on Energy and 200 Tonnes CO₂ Saving

News Discuss 
Installation Overview Newsome has recently delivered the installation and commissioning of a modern 400 kW chiller at a major confectionery manufacturing site in York. Designed to advance ESG targets, the installation enhances cooling reliability while minimising overall energy usage and CO₂ emissions. https://bookmarkyourpage.com/story6188379/advanced-400-kw-chiller-installation-delivers-50-000-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-reduction

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story