Engaged on TRS sheds associated with overhauling and assembly stage maintenance of 25KV AC electrical locos in electrical loco sheds is the worker’s duty. A pop up will open with all stated sites, choose the option “Let“, with the respective site under the position head to enable the notification. To https://railway-recruitment45666.smblogsites.com/32086229/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf